Unit handover decisions
Review access when a mezzanine stair is in the removal scope
- Unit handover decisions

A mezzanine removal can affect how people reach retained areas, equipment or inspection points. The stair cannot be considered only as a piece of steel to remove. This guide helps the GC assemble access questions for the engineer and building contact; it is not a dismantling sequence.
Identify every destination
Show what the stair serves, including equipment platforms or storage that may not appear on the latest layout. Ask the owner to confirm whether those destinations remain in use. Do not infer that a mezzanine is empty or redundant from a quick ground-level view.
Coordinate the replacement arrangement
If a destination remains, the responsible designer and building team must establish the acceptable access arrangement. Record when that arrangement becomes available relative to removal. Keep temporary access and engineering responsibilities explicit rather than leaving them to an informal site workaround.
Release the stair separately
Tie its release to the required approvals, emptying of affected areas and any related service work. Keep structural removal under the reviewed project plan. The handover should identify any access still restricted so later visitors do not assume the old route exists.
FAQ
Questions about this topic
- Does an empty mezzanine mean its stair can go?
- No. Confirm structural, access and building requirements with the responsible parties before releasing removal.
Connect this decision to your project
Start with your situation, compare the related work photos and tell us which removal boundary needs review.
