Identify drain interfaces before patio removal

Excavation equipment beside broken concrete on a cleared lot
Related Siteforce work from our service gallery. This guide describes planning decisions, not a particular completed job.

A patio surface may meet a drain, channel or downpipe arrangement that the owner wants to retain. Before defining the removal footprint, identify those interfaces and who will assess the resulting drainage condition. Concrete removal does not by itself design the replacement drainage.

Record visible drainage features

Show drain covers, channels, downpipes and the relationship to doors or adjoining surfaces. Supply available drainage information and distinguish observation from confirmed underground layout. Do not infer buried pipe routes from a visible cover alone.

Coordinate underground information

Where the work involves ground disturbance, the project needs the appropriate locate review. Privately owned infrastructure may require separate locating arrangements. Give the contractor known private-service information rather than assuming a public utility response covers every feature on the property.

Define the post-removal review

Ask who assesses the exposed drain interface and the interim surface condition before replacement work begins. Record retained features and any area excluded from removal. The landscape or drainage design should address the final arrangement; the demolition scope should not promise a drainage result it has not been designed to deliver.

Questions about this topic

Does a visible drain show all buried services?
No. It is only one visible feature. Review the locate information and any private infrastructure with the responsible parties.